Total Home Makeover

Project Details

Architectural Design Kave Architects Inc.
Structural Engineering Tignum
Construction Farzin Group
Completion Date 2020
Size 495m² [5330ft²]

A change of facade


Key Project Elements:

  1. Removal of the entire exterior facade
  2. Remove the underground parking garage and create a new above ground parking garage
  3. Extensive structural redesign and relocation of interior load bearing walls
  4. New windows and skylights throughout the house

Due to extensive flooding of the basement garage, twice, this project initially started as a design to eliminate the underground parking and make a new two car garage above ground. However, the final design was much more elaborate and the end result speaks for itself.

More Projects